Treated plywood to the concrete with concrete screws spaced every 16 in.
Installing wood laminate floor on concrete.
How to install laminate flooring over concrete.
Many types of flooring can be installed over a concrete sub floor.
Laminate flooring is a popular flooring option because of its attractiveness durability scratch resistance and most importantly its ease of installation.
Lay 6 mil polyethylene sheeting over the concrete to minimize moisture migration from the concrete up into the wood flooring.
My contractor wants to install laminate on top of floor.
Planks can be cut with a hand saw circular saw or flooring cutter and most laminate flooring comes in planks that simply snap together with a tongue.
Remove any carpet or other flooring.
Alternatively screw rows of treated 1x4s to the concrete 16 in.
In colorado dry basement built 1961.
In order to install laminate flooring you need the following.
Multiply length times width of the room.
When installing a laminate floor on top of old tile on top of concrete basement floor.
Wood glue spacers 1 3 0 8 cm.
Add about 10 to that number to account for any possible mistakes and warped boards.
Jig saw vacuum cleaner broom.
Determine how much flooring and materials will be needed.
If you have a vinyl floor you may be able to install your flooring directly on top of it.
Before the installation itself leave laminate boards in the room for some time.
In fact laminate flooring can be installed in almost every room in your home including kitchens since it doesn t have to be glued down and doesn t involve grout or mortar.
Most diyers can complete laminate floor installation in one day.
When installing a floating laminate floor you don t need to use any adhesive nails or staples.
There are also tiles missing here and there.
Laminate flooring is also fairly easy to install.
The previous owner put the really old style tiles on top of concrete.
Slide the first two rows into their final position and repeat steps 5 and 6 above using the same alternating plank technique to complete the process.
If you lay the laminated flooring on new concrete floors you must know that the period of the complete drying is about 80 days.
How to install laminate flooring over concrete important.
Level tape measure chisel rubber hammer hammer.
Laminate flooring packs underlay for laminate flooring.
Laminate flooring is a good alternative to wood flooring in basements.